
Environmental protection facilities
Barrier, protection and drainage layers for landfills, leachate ponds and sites being restored.
Find geosynthetics for waterproofing, reinforcement, drainage and structural protection in Kazakhstan. Choose an industry to see typical applications and materials. ТОО «KazPolimer Engineering» · kazpolimer.kz

Barrier, protection and drainage layers for landfills, leachate ponds and sites being restored.

Reinforcement, layer separation and drainage for road and railway infrastructure.

Seepage control for reservoirs and channels, plus erosion protection for beds, slopes and banks.

Geosynthetics for seepage barriers in tailings facilities, process water ponds and sludge containment areas.

Materials for secondary spill containment, lined operating areas and temporary access roads.

Polymer linings for reinforced concrete tanks, sewers and channels exposed to corrosive media.

Lining systems for irrigation canals, farm water storage basins and agricultural ponds.

Reinforcement and separation in airfield pavement foundations, with filtration in drainage systems.

Seepage barriers for ash disposal areas and process ponds, plus drainage and temporary access at power generation sites.

Lining for lagoons and settling ponds, reinforced concrete tank protection and sludge dewatering.
Tell us about the application, material requirements and estimated quantity. If you have a technical specification, attach it to your email.