Hydraulic engineering construction

Seepage control for reservoirs and channels, plus erosion protection for beds, slopes and banks. ТОО «KazPolimer Engineering» · kazpolimer.kz

Applications

  • Basins and channels. Geomembrane selection accounts for the substrate, interfaces, penetrations and perimeter anchoring.
  • Banks and slopes. Concrete-filled mattresses and cementitious geosynthetic mats can be considered for erosion protection at the design flow velocities.
  • Bank retaining structures. Specify polymer sheet piles for the loads, ground conditions and restraint system.

Materials for your project

Frequently asked questions

What can line a channel bed and side slopes?

A designed barrier system limits seepage. A concrete blanket or concrete-filled fabric mattress can provide a lining for surface erosion protection.

How do waterproofing and bank protection differ?

Waterproofing limits seepage through the structure. Bank protection addresses erosion and instability. A single project may need both.

What affects lining selection for a reservoir slope?

Water levels, wave action, slope gradient, soil, potential scour and operating conditions affect lining thickness, foundation preparation and edge anchoring.

What to include in your enquiry

Share the range of water levels, slope geometry, flow conditions, foundation section and interface drawings.