Agriculture

Lining systems for irrigation canals, farm water storage basins and agricultural ponds. ТОО «KazPolimer Engineering» · kazpolimer.kz

Applications

  • Water storage basins. A geomembrane limits seepage through the base and slopes, with protective fabric considered as part of the substrate preparation.
  • Irrigation canals. Liner selection accounts for seasonal operation, connections to concrete structures and maintenance.
  • Banks. Where specified, polymer sheet piles can protect the edge of a canal or pond.

Materials for your project

Frequently asked questions

How do I select a geomembrane for an irrigation reservoir?

Provide dimensions, depth, slope profiles, soil information and details of seasonal drawdowns. These inform the liner, protection layer and connection design.

What matters when lining an irrigation channel?

Consider seepage losses, flow velocity, channel condition and maintenance access. Each layer should address its specified barrier or erosion-protection function.

Is geotextile required beneath a farm pond liner?

It may be needed to protect the liner from stones and uneven ground. Base the decision on ground preparation, contact loads and puncture risk.

What to include in your enquiry

Provide the intended water use, basin dimensions or canal section, seasonal operating conditions and substrate type.