
Geogrid
Planar polymer grids for reinforcing pavement layers and soil structures.
Reinforcement, layer separation and drainage for road and railway infrastructure. ТОО «KazPolimer Engineering» · kazpolimer.kz

Planar polymer grids for reinforcing pavement layers and soil structures.

Woven and nonwoven fabrics for separation, filtration, protection and reinforcement.

Three-dimensional cells that hold soil or aggregate and stabilise the base.

Modular polymer mats for temporary access routes and working areas.
A separation layer maintains the boundary between the soil and aggregate. Reinforcement, stabilisation and drainage are separate functions specified for the pavement design.
Identify the cause of the problem and the required function first. A geotextile can separate layers. A geogrid can interact with aggregate in a reinforced layer.
It may be specified to reinforce a layer in new construction or resurfacing. The design sets the grid location, coating and bonding requirements.
Provide the pavement section, design loads, soil information, aggregate grading and drainage layout.