
Geomembrane
Polymer sheets for seepage barriers and structural waterproofing.
Lining for lagoons and settling ponds, reinforced concrete tank protection and sludge dewatering. ТОО «KazPolimer Engineering» · kazpolimer.kz
Geomembranes can line lagoons, anchored sheets can line reinforced concrete and geotextile tubes can dewater sludge.
Provide the basin dimensions, medium composition, level fluctuations, cleaning methods and subgrade conditions. These determine barrier, protection and connection details.
Check the medium composition and temperature and the type of concrete structure. The design specifies the polymer, fixing details, panel layout and weld inspection.
Provide the wastewater or sludge composition and volume. For dewatering, include solids content and the filtrate collection layout.