
Geomembrane
Polymer sheets for seepage barriers and structural waterproofing.
Seepage barriers for ash disposal areas and process ponds, plus drainage and temporary access at power generation sites. ТОО «KazPolimer Engineering» · kazpolimer.kz

Polymer sheets for seepage barriers and structural waterproofing.

Woven and nonwoven fabrics for separation, filtration, protection and reinforcement.

Roll-out drainage material with a three-dimensional core and several facing options.

Modular polymer mats for temporary access routes and working areas.
They are considered for process pond and ash disposal liners, drainage and temporary access roads. Each area has its own material requirements.
Assess leachate composition, temperature, loads, slopes, subgrade and drainage. The design sets the liner layers and seam inspection method.
Identify loads and puncture risks at the subgrade, in backfill and around penetrations. Select the protection layer for those conditions.
Share the liner cross-section, chemical composition of the liquid, service temperatures and design loading on the drainage layer.