Airfield construction

Reinforcement and separation in airfield pavement foundations, with filtration in drainage systems. ТОО «KazPolimer Engineering» · kazpolimer.kz

Applications

  • Runways and taxiways. Geogrids can be specified in the designed pavement foundation layer.
  • Aprons. Geotextile separates soil from aggregate when the fabric and installation meet the design requirements.
  • Subsurface drainage. Select the filter fabric for the soil properties and drainage conditions.

Materials for your project

Frequently asked questions

How are geosynthetics used in airfield pavements?

They can separate layers, reinforce foundations and filter water in drainage systems. The pavement design specifies materials based on loads and layer construction.

Can a road geogrid be used on an airfield?

The pavement designer selects a grade based on loads and airfield requirements. Suitability for ordinary road applications is insufficient on its own.

What matters when reinforcing a taxiway foundation?

Check the pavement layer, subgrade properties, loads and aggregate gradation. Set the grid requirements and placement from those conditions.

What to include in your enquiry

Provide the airfield area classification, pavement section, design loads and ground properties.