Oil and gas facilities

Materials for secondary spill containment, lined operating areas and temporary access roads. ТОО «KazPolimer Engineering» · kazpolimer.kz

Applications

  • Tank farms and storage areas. Verify the selected liner grade for contact with each relevant liquid in the secondary containment system.
  • Process containment. Specify the liner assembly, protection layers and pipe penetrations for the individual facility.
  • Temporary access. Select road mats for vehicle loads and ground conditions.

Materials for your project

Frequently asked questions

What is a geomembrane used for at an oil and gas site?

It may be part of the barrier system for process areas or secondary spill containment. Select the grade and details for the conditions the system must handle.

How do I check whether a liner can withstand oil or chemicals?

Describe the liquid composition, temperature and likely contact time. Request compatibility data for the selected polymer and its joints.

Which details matter in secondary containment?

Review bunds, overflow points, pipe penetrations, seams and connections to foundations. They should work together as one containment system.

What to include in your enquiry

Provide the liquid list and concentrations, service temperature, expected contact duration and site loads.