
Geomembrane
Polymer sheets for seepage barriers and structural waterproofing.
Geosynthetics for seepage barriers in tailings facilities, process water ponds and sludge containment areas. ТОО «KazPolimer Engineering» · kazpolimer.kz

Polymer sheets for seepage barriers and structural waterproofing.

Woven and nonwoven fabrics for separation, filtration, protection and reinforcement.

A multilayer material that combines a geomembrane with protective geotextile.

Roll-out drainage material with a three-dimensional core and several facing options.
The design may include barrier, protection, filter and drainage layers. The arrangement depends on geology, water conditions, tailings composition and project requirements.
Consider liquid composition and temperature, water levels, contact materials and design deformation. Confirm chemical resistance for the chosen grade.
Assess the size and shape of protrusions and the condition of the surface. Prepare and check the specified levelling and protection layers before laying the liner.
Provide the liner area and cross-section, slope geometry, liquid composition, protective layer properties and quality control plan.