Reinforced concrete protection

Polymer linings for reinforced concrete tanks, sewers and channels exposed to corrosive media. ТОО «KazPolimer Engineering» · kazpolimer.kz

Applications

  • New structures. The raised anchors on V-Lock sheets lock into the concrete and hold the lining in place.
  • Tanks and sewers. Liner integrity depends on seams, pipe entries and connections to neighbouring structures.
  • Below-grade concrete walls. Profiled drainage composites can protect the waterproofing and provide exterior drainage where specified.

Materials for your project

Frequently asked questions

Why line reinforced concrete with a polymer sheet?

The lining separates the concrete from the medium. Material selection depends on chemical composition, temperature, abrasion and joint details.

When is a mechanically anchored liner chosen?

It is considered where the design requires the polymer to be secured within the concrete. One common method is fixing the sheet to formwork before casting.

What should a sewer collector lining design account for?

Check the operating medium, channel, wall and roof geometry and maintenance needs. Pay particular attention to continuity across joints and around penetrations.

What to include in your enquiry

Share the structure drawings, exposure and temperature data, joint locations and seam testing requirements.