Environmental protection facilities

Barrier, protection and drainage layers for landfills, leachate ponds and sites being restored. ТОО «KazPolimer Engineering» · kazpolimer.kz

Applications

  • Landfill bases and slopes. A geomembrane and a geosynthetic clay liner can form part of the containment system.
  • Leachate collection. A drainage layer conveys liquid to the specified collection system.
  • Site restoration. Geotextile separates layers and protects the liner against puncture during backfilling.

Materials for your project

Frequently asked questions

What geosynthetics are used in landfills?

A landfill design may combine a geomembrane, a bentonite mat, protective geotextile and a drainage geocomposite. The base, side slopes and cap have different functions.

How does a landfill base liner differ from a closure cap?

A base liner limits the migration of leachate. A closure cap manages rainfall infiltration and drainage. The design specifies the layers separately.

How is a liner selected for a leachate pond?

The design uses leachate composition and temperature, operating levels, ground conditions and sediment data to specify the membrane, protection and connection details.

What to include in your enquiry

Share the leachate composition, slope angles, drainage loading, barrier cross-section and seam testing requirements.