Geocell

Three-dimensional cells that hold soil or aggregate and stabilise the base.

Discuss your project

The geocell is expanded over a prepared surface and filled with the specified material. Its cells confine the infill. Cell height, size and wall type depend on loading, slope and drainage requirements. ТОО «KazPolimer Engineering» · kazpolimer.kz

Read the detailed description

Available configurations

Geocell — Perforated

Perforated

Perforated walls allow water to pass between cells.

Geocell — Nonperforated

Nonperforated

Cells with solid walls.

Photos

Applications

  • Stabilising aggregate bases for access roads and temporary routes.
  • Confining infill on working platforms and parking areas.
  • Protecting road embankments and bridge abutment slopes against erosion.
  • Reinforcing the sub-ballast layer of railway embankments where specified.

Benefits

  • Three-dimensional cells restrict lateral movement of infill.
  • Wall perforations allow water to pass between adjacent cells.
  • Available cell sizes and wall heights allow the panel to be matched to the infill grading and layer thickness.

Installation

  1. Prepare and approve the subgrade to the design levels. Place any specified separation or filter layer before laying out the panels.
  2. Expand the panels to their working dimensions, connect adjacent panels and secure them to the specified anchorage layout.
  3. Check the geometry and connections, then place the specified infill while monitoring panel alignment.
  4. Level the infill. For an aggregate base, carry out the specified compaction and check the finished surface levels.

Technical specifications

PropertyValue
Cell wall material Welded polyethylene strips
Wall configurations Perforated and solid
Cell size, mm 165 × 165, 220 × 220, 330 × 330
Wall height, mm 50, 100, 150 or 200
Weld spacing, mm 330, 440 or 660
Longitudinal tensile strength of solid strip, MPa At least 13
Longitudinal tensile strength of perforated strip, MPa At least 8

Tensile strength refers to the individual strip. Check the working panel dimensions and the available combination of wall height and cell size in the product datasheet.

How a geocell confines infill

A geocell is an expandable panel made from connected polymer strips. Opening the panel forms a three-dimensional network of cells, each with a specified depth and plan size. With the infill in place, the cell walls restrain sideways movement of the material under load. On a slope, a suitably designed panel can help hold surface infill in place. The fill, restraint and outlet details affect how the surface responds to runoff.

In a pavement or access route, the geocell forms part of a filled layer. The cover, compaction and condition of the underlying soil all influence how that layer behaves under traffic. For an exposed slope, the design also considers the geometry of the ground, where water reaches the slope and the stability of the larger earthwork. The project determines the section and the layout of the modules before excavation or filling begins.

Perforated and solid wall panels

Openings in perforated walls connect adjacent cells. With a suitably permeable infill, those openings provide paths for lateral movement of water within the filled layer. Perforated panels can be considered for vegetated slopes and where the design calls for water to move between cells. Water still needs a discharge route. Runoff concentrated at a road outlet or culvert may call for a separate channel or additional erosion protection at the point of discharge.

Solid wall panels also confine infill within the cells. Their suitability depends on the specified section, contact with the subgrade and the drainage measures designed for the site. For either wall type, compare depth, the cell opening at full expansion and the performance of the strip connections. A change in the expanded dimensions can alter the quantity, panel layout and appropriate infill grading. The dimensions on a material schedule should refer to the panels in their installed configuration.

Applications on slopes, roads and platforms

On an embankment or bridge approach, the geocell may form part of a surface treatment. A vegetated system needs fill suitable for the intended planting and a restraint detail that holds the panels while the surface establishes. A stone-filled design calls for a compatible grading and a specified finished level. Drawings should also show the upper and lower edges, transitions to drains and how panels finish around structures or service outlets.

Along a temporary access route or on a working platform, the cells may confine a granular layer where the vehicles impose repeated loads. Entry points, loading areas and tight turns can see different traffic movements from the straight runs between them. Identifying those areas on the plan helps the designer evaluate the project sections. Where fine soil could mix with the aggregate, a designed geotextile layer can provide separation beneath the geocell.

Where a work area narrows, the layout should also show how cut panels finish at the edges. This detail matters where frequent wheel paths pass close to a margin or an adjoining drainage channel.

Field checks before filling the cells

Before laying the panels, check the formation level, surface condition and drainage paths. Expand the panels to the dimensions shown on the layout and check the shape of the cells and the joints between adjoining sections. Follow the project details for connectors and anchorage, particularly near slope crests, margins and changes in level. Inspection at this stage gives the site team a clear view of connection defects or misaligned panels before infill conceals the work.

Place infill by a method that keeps open cells and joints in position. Compaction and access for plant depend on the design and the supplier’s instructions for that panel and infill. In a trafficked application, cover protects the cell walls from direct wheel contact. With an exposed aggregate wearing surface, maintenance can include checking for low spots or loss of cover. On a vegetated slope, check for local scouring following heavy rain, especially around drainage outlets and along the panel edges.

Dimensions and details for a supply enquiry

Send KazPolimer a site plan, representative section, proposed infill and the intended function of the layer. For roads and platforms, include information on the subgrade and the vehicles that will use the area. For slopes, include the surface length, gradient, height and locations where runoff reaches or leaves the slope. Where the design already sets a panel grade, list the expanded opening, wall depth, wall type and any specified connections.

Work out quantities from the area to be covered by the opened panels. For sloping work, measure along the face and use the layout to account for cuts around structures, changes in direction and the treatment of boundaries. A schedule can distinguish the panels from connectors, anchors and infill. These details are useful when checking a proposed panel against the drawings and agreeing how to split the supply into work areas or deliveries.

Frequently asked questions

What is a geocell?

A geocell is an expandable three-dimensional panel made of joined polymer strips. Its cells are filled with the specified material to restrain movement of the infill.

How does a geocell differ from a flat geogrid?

Geocell walls confine the infill in three dimensions. A flat geogrid works within a pavement or soil layer through interaction between its ribs and the aggregate.

Where are geocells used?

Applications include access roads, work platforms and slope protection. The design checks soil conditions, gradient, water and loads.

Related materials