
Anchored liner sheet
Polymer lining for protecting reinforced concrete exposed to aggressive media.
Roll-out drainage material with a three-dimensional core and several facing options.
Discuss your projectThe three-dimensional core forms a drainage layer. Geotextile or geomembrane facings add a filtration or waterproofing function, depending on the configuration. ТОО «KazPolimer Engineering» · kazpolimer.kz
Read the detailed description| Property | 1D | 2D | 3D | 3D/M |
|---|---|---|---|---|
| Facing on the drainage net | Unfaced | Geotextile on one side | Geotextile on both sides | Geotextile on one side, geomembrane on the other |
| Minimum thickness at 2 kPa, mm | See data sheet | 8 | 10 | 9.5 |
| Minimum longitudinal/transverse breaking load, kN/m | See data sheet | 12 / 11 | 20 / 18 | 55 / 35 |
| Compression resistance, kPa | See data sheet | 1 250 | 1 600 | 2 000 |
| Minimum in-plane hydraulic conductivity at 2 kPa, m/day | See data sheet | 100 | 550 | 550 |
| Minimum in-plane hydraulic conductivity at 20 kPa, m/day | See data sheet | 60 | 500 | 500 |
| Nominal roll width, m | See data sheet | 2.5 or 4.3 | 2.5 or 4.3 | 2.8 or 4.3 |
| Nominal roll length, m | See data sheet | 40 | 40 | 20 |
Numerical values are for 2D, 3D and 3D/M with 250 g/m² geotextile. Confirm the 1D figures and design flow capacity for the project conditions.
Hydromat is a roll-out geocomposite used to carry water within a layered structure. The open polymer net provides a path for water flowing along the product. A cross-section shows how water reaches the drainage layer, which way it moves and where it enters the receiving system. Use the same drawing to establish how the core connects at the boundaries of the drained area.
Behind a retaining wall, water arriving through the backfill can flow down to a collector at the toe. In a horizontal build-up, drainage follows the falls to an edge or receiving strip. Compare the anticipated inflow and available layer width for each part of the project. Sections with a long flow path or a local restriction near the outlet deserve separate checks because they may carry accumulated flow.
The 1D version is the open core without a factory facing. It suits layouts where any required filter or separator is specified as a separate layer. Review what touches each side of the core. Where soil would abut the open channels, the design should establish how to control movement of particles into the net.
The 2D version has geotextile on one side and is an option where water enters through one soil-facing surface. Check what lies against the opposite side. In the 3D version, each side has a geotextile facing. This permits filtered contact on both sides when the facing properties match the adjacent layers and site conditions.
In Hydromat 3D/M, a geotextile faces one side and a geomembrane faces the other. Mark the orientation in the section and at the edges. If the membrane side forms part of a waterproofing system, specify the way the barrier joins adjacent sheets and details. Watertightness depends on the installed assembly, including its connections and terminations.
Evaluate water entering through a facing separately from water conveyed through the plane of the core. For in-plane drainage, compare flow per unit width or transmissivity with the stated test conditions. The normal pressure, hydraulic gradient and surfaces touching the specimen affect the result. Compare data for conditions representative of the intended installation.
Check the expected pressure from backfill, covers and operating loads transmitted to the drainage layer. Sustained pressure can deform an open core. A facing can also press into its channels and reduce the space available for water. Assess these effects for the design period, with project-specific checks for clogging by mineral deposits or biological growth where exposure conditions make these mechanisms relevant.
Water needs a continuous path to the receiving pipe, channel or other outlet. Show the roll direction and core-to-core connections on the installation layout. Review junctions to make sure they maintain the designed flow path and keep soil away from exposed edges. Size the receiving system for the water collected across its contributing zone.
At walls, locate fixings and changes in direction around penetrations. Below paved or covered areas, check the formation levels and any low points. Before covering the work, verify facing orientation, the condition of the filter and access to outlets that need inspection. Follow the project details and the manufacturer's handling and fixing instructions for the chosen configuration. For phased works, identify any temporary covers needed before the next layer is placed.
When considering Hydromat as part of an alternative to granular drainage, identify which layers and components belong to the new assembly. The facing, core and outlet have separate functions. List the collector and its transitions in the schedule alongside the drain itself so each interface is covered by the specification and scope of supply.
Roll quantity depends on the extent of the area, drainage direction, usable roll width, junctions and cutting around details. Use the installation layout to compare proposed roll sizes. For performance comparisons between grades, ask for flow figures under equivalent loads and gradients. A schedule by work zone is useful where separate layouts connect to one collector.
For a project in Kazakhstan, share a cross-section showing the adjacent materials, direction of drainage and outlet location. Give the required Hydromat configuration when 1D, 2D, 3D or 3D/M has already been specified. For a performance-based enquiry, include estimated inflow, hydraulic gradient and normal stress on the drainage layer or the reference conditions stated in the specification.
Include quantities, delivery location and the installation schedule for each zone. Identify where supporting test data or a product sheet is needed for approval. For sites that use a range of facings, list them as separate items to make it easier to match the product labels with each work zone on arrival.
It is a rolled product with a three-dimensional drainage core. Depending on the grade, the core can be combined with filter or barrier layers.
The catalogue lists 1D with a bare core, 2D with geotextile on one side and 3D with geotextile on both sides. Confirm the construction and properties in the grade data sheet.
This grade has geotextile on one side of the drainage core and a geomembrane on the other. The installation detail specifies how to orient the layers.