
Anchored liner sheet
Polymer lining for protecting reinforced concrete exposed to aggressive media.
Interlocking polymer profiles for bank protection and retaining structures.
Discuss your projectPVC sheet pile profiles join through continuous interlocks. The section and embedment depth depend on loading, ground properties and the specified restraint system. ТОО «KazPolimer Engineering» · kazpolimer.kz
Read the detailed description| Property | SP 250 | SP 600 |
|---|---|---|
| Profile material | PVC | PVC |
| Connection | Continuous interlock | Continuous interlock |
| Wall thickness, mm | 9.0 | 9.0 |
| Profile section depth, mm | 118.5 | 182 |
| Minimum section modulus, cm³/m | 830 | 976 |
| Minimum second moment of area, cm⁴/m | 8,563.3 | 11,022 |
| Minimum material tensile strength, MPa | 37 | 37 |
The figures describe the section and profile material. Determine the pile length, embedment and wall restraints by design and confirm them in the order specification.
Polymer sheet piles are shaped PVC members with continuous interlocks along their edges. Neighbouring members engage as they are installed, forming a wall. Applications include channel edges, bank protection and designed soil retention. Each application has its own design case. On a riverbank, scour can lower the ground in front of the wall. At a filled site, backfill conditions and loads near the crest can control the choice of section.
The engineer considers the wall together with the soil, surcharge, restraint and water levels on either side. A high canal level, a rapid drawdown event and the weight of plant near the crest can produce different load cases. Bank protection design also addresses the ends of the wall and the exposure of the toe to erosion. Transitions into an existing bank deserve attention because water can pass around the wall.
Establish the retained height, the toe level, the depth of embedment and the acceptable movement at the top. Compare sections using the stiffness and bending resistance documented for the proposed profile. Sustained loading and service temperature matter when evaluating polymer behaviour. Where a wall uses anchors, ties or a waling beam, include the position of the restraint and the way its forces pass between the members.
Start with geotechnical sections that show the soil layers and groundwater levels. Provide bank levels, proposed backfill, the drainage layout and the positions of loads or structures close to the wall. A profile selected for a typical section also needs to be checked where wall heights change, where the ground varies and where the wall turns or ends. A schedule can identify which lengths and profiles apply to each reach.
For exposed portions of the wall, describe the expected wave action, ice and accidental impacts. Where vehicles use the crest, show their routes and nearby storage areas on the plan. Mark each typical section on the alignment so the field team can locate it.
The longitudinal interlock joins adjacent profiles. For a hydraulic wall, the project also needs a seepage criterion and a way to verify performance. Water can move through joints, beneath the toe or around wall ends. The ground profile and water levels affect the likely paths. Specify whether joint sealing is required and how compatibility with the selected section and installation method will be checked. Design the wall ends and any cut-off details as part of that same system.
Show corners, transitions and terminations on the setting-out plan. Bends and junctions may require compatible connectors or designed special pieces. Include those items in the schedule alongside the straight runs and account for their effective width. At a junction with concrete, the structural detail should accommodate how the polymer wall and the concrete move under loading and changes in groundwater. Check that the area remains accessible for installation and inspection.
Select the installation method in light of the ground, pile length and equipment access. Dense layers, cobbles or buried foundations can affect the depth that can be reached and may damage the interlocks. A guide frame can help maintain the line, and difficult ground may require a suitable driving aid. Agree the equipment and working method with the design team and obtain the product-specific installation guidance before mobilisation.
Check the interlocks before assembly and monitor line and verticality as the profiles go in. Record final levels, interruptions and deviations by section of wall. When a profile encounters unexpected resistance, examine the cause and review the installation method with the project team. Inspect visible interlocks, the cap and any restraint connections before backfilling. The acceptance plan can identify the checks to complete before any connections are concealed.
Send KazPolimer the wall alignment, longitudinal levels, typical sections and the profile schedule. Where the design is complete, include the required resistance and stiffness and the lengths specified in each reach. A quantity in linear metres of wall can be converted into the number of piles using the effective installed width of the proposed profile. Allow separately for corners and junctions and list any length changes on the schedule. Include the take-off drawing reference.
For delivery in Kazakhstan, specify the unloading point, the construction stages and any limits on vehicle access or load length. Confirm which accessories are included in the quotation and how each bundle will be labelled and checked at delivery. Organise the schedule by work section to help the site team identify the correct profiles in storage and release them in the installation sequence. If revisions are expected, note the drawing revision on the enquiry.
It consists of PVC profiles with interlocking edges. The profiles form a wall supported and anchored according to the design.
Applications include shorelines, channels, retaining walls and seepage cut-offs. The intended use determines the requirements for the profile and interlocks.
They have different cross-section shapes and properties. Compare effective width, profile depth, section modulus and installation requirements in their data sheets.