Modern geosynthetics

10+ years of experience. Installation of Leister geomembranes (Switzerland) tightness for centuries.

Why we:

  • Certificates: GM13, ST RK, GOST
  • Turnkey: from A to Z
  • Guarantee
  • Technical support
  • Payment - as it is convenient for you

KazPolimer Trading House LLP is No. 1 in Kazakhstan. Point.

Telephone: +7 (701) 222 69 55‬
Mail: info@kazpolimer.kz
Адрес: Kazakhstan, Almaty, md. Kairat 282

All products

Industry solutions

Geosynthetic materials of Kazpolimer Trading House LLP are used in key sectors of the economy of Kazakhstan.
We supply modern solutions for insulation, drainage, reinforcement and protection of engineering structures.

Environmental protection facilities

Environmental protection facilities

Reliable waterproofing of landfills, settling tanks and storage facilities. Protection of soils and groundwater from pollution.

Transport construction

Transport construction

Reinforcement, filtration, and drainage of the foundations of roads, railways, and highways. Increase the service life of the coating.

Hydraulic engineering construction

Hydraulic engineering construction

Waterproofing of ponds, canals, dams, reservoirs and dams. Ensuring tightness and resistance to water.

Mining industry

Mining industry

Isolation of tailings dumps, sludge accumulators and landfills. Prevention of leakage of harmful substances into the soil and groundwater.

Oil and gas complex

Oil and gas complex

Waterproofing of reservoirs, settling tanks, storage areas and industrial facilities. Chemical resistance.

Protection of reinforced concrete

Protection of reinforced concrete

Prevention of corrosion, cracking and destruction of concrete structures under the influence of moisture and aggressive environments.

Agricultural industry

Agricultural industry

Creation of water storage facilities, irrigation systems and artificial ponds. Optimization of water resources in the agricultural sphere.

Construction of airfields

Construction of airfields

Reinforcement and stabilization of runway bases, increasing the bearing capacity of soils.

The energy complex

The energy complex

Protection and waterproofing of ash dumps, storage facilities and industrial sites of power plants.

Sewage treatment plants

Sewage treatment plants

Comprehensive solutions for waterproofing lagoons, filters, reservoirs and wastewater settling tanks.

Industry leaders trust us

ТОО Алайгыр
АО Баст
АО УКТМК
ТОО Казцинк
Bazis Construction
BI Group