
Anchored liner sheet
Polymer lining for protecting reinforced concrete exposed to aggressive media.
Polymer linings for reinforced concrete tanks, sewers and channels exposed to corrosive media. ТОО «KazPolimer Engineering» · kazpolimer.kz
The lining separates the concrete from the medium. Material selection depends on chemical composition, temperature, abrasion and joint details.
It is considered where the design requires the polymer to be secured within the concrete. One common method is fixing the sheet to formwork before casting.
Check the operating medium, channel, wall and roof geometry and maintenance needs. Pay particular attention to continuity across joints and around penetrations.
Share the structure drawings, exposure and temperature data, joint locations and seam testing requirements.