Industry solutions
Geosynthetic materials of Kazpolimer Trading House LLP are used in key sectors of the economy of Kazakhstan.
We supply modern solutions for insulation, drainage, reinforcement and protection of engineering structures.
Why we:
- Certificates: GM13, ST RK, GOST
- Turnkey: from A to Z
- Guarantee
- Technical support
- Payment - as it is convenient for you
KazPolimer Trading House LLP
No. 1 in Kazakhstan. Point.
Telephone: +7 (701) 222 69 55
Mail: info@kazpolimer.kz
Address: Kazakhstan, Almaty, md. Kairat 282
Environmental protection facilities
Reliable waterproofing of landfills, settling tanks and storage facilities. Protection of soils and groundwater from pollution.
Transport construction
Reinforcement, filtration, and drainage of the foundations of roads, railways, and highways. Increase the service life of the coating.
Hydraulic engineering construction
Waterproofing of ponds, canals, dams, reservoirs and dams. Ensuring tightness and resistance to water.
Mining industry
Isolation of tailings dumps, sludge accumulators and landfills. Prevention of leakage of harmful substances into the soil and groundwater.
Oil and gas complex
Waterproofing of reservoirs, settling tanks, storage areas and industrial facilities. Chemical resistance.
Protection of reinforced concrete
Prevention of corrosion, cracking and destruction of concrete structures under the influence of moisture and aggressive environments.
Agricultural industry
Creation of water storage facilities, irrigation systems and artificial ponds. Optimization of water resources in the agricultural sphere.
Construction of airfields
Reinforcement and stabilization of runway bases, increasing the bearing capacity of soils.
The energy complex
Protection and waterproofing of ash dumps, storage facilities and industrial sites of power plants.
Sewage treatment plants
Comprehensive solutions for waterproofing lagoons, filters, reservoirs and wastewater settling tanks.






















