LDPE
HDPE
PVC
LLDPE
EPS
PP

LDPE

Low Density
Polyethylene

10803-020 Kazan

PJSC “KazanOrgSintez”

OBTAINED BY:

High-pressure (low-density) polyethylene is obtained by polymerization of ethylene at high pressure in mixed tubular reactors with the use of radical-type initiators.

PURPOSE:

It is intended for manufacture of bags, pipes, fitting pieces, articles designed for contact with foodstuffs, toys, films and film articles, shaped and linear articles, etc.

DESIGNATORY PROPERTIES:

Guaranteed storage life: 3 years from the manufacture date. Natural-color pellets.

10803-020 Ufa

OJSC “UfaOrgSintez”

OBTAINED BY:

High-pressure (low-density) polyethylene is obtained by polymerization of ethylene at high pressure in mixed tubular reactors with the use of radical-type initiators.

PURPOSE:

It is intended for manufacture of bags, pipes, fitting pieces, articles designed for contact with foodstuffs, toys, films and film articles, shaped and linear articles, etc.

DESIGNATORY PROPERTIES:

Guaranteed storage life: 3 years from the manufacture date. Natural-color pellets.

15313-003 Kazan

PJSC “KazanOrgSintez”
GOST 16337-77

OBTAINED BY:

High-pressure (low-density) polyethylene is obtained by polymerization of ethylene at high pressure in mixed tubular reactors with the use of radical-type initiators.

PURPOSE:

It is intended for manufacture of bags, pipes, fitting pieces, articles designed for contact with foodstuffs, toys, films and film articles, shaped and linear articles, etc.

DESIGNATORY PROPERTIES:

Guaranteed storage life: 2 years from the manufacture date. Natural-color pellets.

15813-020 Kazan

PJSC “KazanOrgSintez”
GOST 16337-77

OBTAINED BY:

High-pressure (low-density) polyethylene is obtained by polymerization of ethylene at high pressure in mixed tubular reactors with the use of radical-type initiators.

PURPOSE:

It is intended for manufacture of bags, pipes, fitting pieces, articles designed for contact with foodstuffs, toys, films and film articles, shaped and linear articles, etc.

DESIGNATORY PROPERTIES:

Guaranteed storage life: 3 years from the manufacture date. Natural-color pellets.

15813-020 Ufa

OJSC “UfaOrgSintez”

OBTAINED BY:

High-pressure (low-density) polyethylene is obtained by polymerization of ethylene at high pressure in mixed tubular reactors with the use of radical-type initiators.

PURPOSE:

It is intended for manufacture of bags, pipes, fitting pieces, articles designed for contact with foodstuffs, toys, films and film articles, shaped and linear articles, etc.

DESIGNATORY PROPERTIES:

Guaranteed storage life: 3 years from the manufacture date. Natural-color pellets.

FA2004

PJSC “KazanOrgSintez”
Technical specification:

OBTAINED BY:

High-pressure (low-density) polyethylene is obtained by polymerization of ethylene at high pressure in mixed tubular reactors with the use of radical-type initiators.

PURPOSE:

It is intended for manufacture of bags, pipes, fitting pieces, articles designed for contact with foodstuffs, toys, films and film articles, shaped and linear articles, etc.

DESIGNATORY PROPERTIES:

Guaranteed storage life: 2 years from the manufacture date. Natural-color pellets.

15303-003 Tomskneftekhim

LLC “Tomskneftekhim”

OBTAINED BY:

High-pressure (low density) polyethylene is obtained by polymerization of ethylene at high pressure in tubular reactors with a mixing device using radical type initiators.

PURPOSE:

For the manufacture of bags, pipes, fittings, for products intended for contact with food, toys, shrink films and film products, molded products, etc.

DESIGNATORY PROPERTIES:

Shelf life: 2 years from the date of manufacture. Natural color granules.

15803-020 Tomskneftekhim

LLC “Tomskneftekhim”

OBTAINED BY:

High-pressure (low density) polyethylene is obtained by polymerization of ethylene at high pressure in tubular reactors with a mixing device using radical type initiators.

PURPOSE:

For the manufacture of films and film products, including shrink, thin, food contact films (including hermetic packaging), general purpose films, bags.

DESIGNATORY PROPERTIES:

Shelf life: 2 years from the date of manufacture. Natural color granules.

HDPE

High Density
Polyethylene

SNOLEN ЕР 0.26/51N

LLC “Gazprom Neftekhim Salavat”

OBTAINED BY:

It is obtained by the suspension method using the Hostalen technology of Basell Polyolefine GmbH.

PURPOSE:

Extrusion pipe grades. Process pipes (including delivery pipes). Drinking water pipes. Wear plates. Fitting pieces.

DESIGNATORY PROPERTIES:

Very high environmental stress cracking resistance. High impact resilience. High hydrostatic strength for pipe grades. It does not require UV protection. Natural-color pellets.

PE2NT11-285D

PJSC “KazanOrgSintez”

OBTAINED BY:

It is obtained by way of copolymerization of ethylene by using the gas-phase method at low pressure with the use of a catalyst.

PURPOSE:

The compound is intended for manufacturing pipes and connecting pieces of gas distribution networks, as well as delivery pipes and connecting pieces of the drinking and household cold-water supply, compounds for color-bar markings, articles manufactured by the extrusion blow molding method, and for manufacturing high-strength heavy-gage films, at least 20 µm thick.

DESIGNATORY PROPERTIES:

Very high environmental stress cracking resistance. High impact resilience. High hydrostatic strength for pipe grades. It does not require UV protection. Guaranteed storage life: 5 years from the manufacture date. Natural-color pellets.

PE2NT11-9

PJSC “KazanOrgSintez”

OBTAINED BY:

It is obtained by way of copolymerization of ethylene by using the gas-phase method at low pressure with the use of a catalyst.

PURPOSE:

The compound is intended for manufacturing pipes and connecting pieces of gas distribution networks, as well as delivery pipes and connecting pieces of drinking and household cold-water supply systems.

DESIGNATORY PROPERTIES:

Very high environmental stress cracking resistance. High impact resilience. High hydrostatic strength for pipe grades. It does not require UV protection. Guaranteed storage life: 5 years from the manufacture date. Natural-color pellets.

6948С

PJSC “NizhnekamskNeftekhim”
Technical specification: 2211-145-05766801-2008

OBTAINED BY:

It is obtained by the gas-phase method of copolymerizing ethylene with hexene-1 in the presence of complex organometallic catalysts.

PURPOSE:

The compound is intended for manufacturing pipes and connecting pieces of gas distribution networks, as well as delivery pipes and connecting pieces of drinking and household cold-water supply systems, compounds for color-bar markings, articles manufactured by the extrusion blow molding method, and for manufacturing high-strength heavy-gage films with thickness of at least 20 µm.

DESIGNATORY PROPERTIES:

Very high environmental stress cracking resistance. High impact resilience. High hydrostatic strength for pipe grades. It does not require UV protection. Guaranteed storage life: 5 years from the manufacture date. Natural-color pellets.

273-83

PJSC “KazanOrgSintez”
Technical specification: 2243-104-00203335-2005

OBTAINED BY:

It is obtained by way of copolymerization of ethylene by using the gas-phase method at low pressure with the use of supported complex catalysts.

PURPOSE:

The compound is intended for obtaining industrial-use articles by the blowing method, for example, fluid cans up to 20 liters in volume. The compound is also intended for processing by the extrusion method to produce articles for household use.

DESIGNATORY PROPERTIES:

Guaranteed storage life: 5 years from the manufacture date. Natural-color pellets.

293-285D

PJSC “KazanOrgSintez”
Technical specification: 2243-174-00203335-2000

OBTAINED BY:

It is obtained by way of copolymerization of ethylene by using the gas-phase method at low pressure with the use of supported complex catalysts.

PURPOSE:

The compound is intended for processing by the extrusion method to produce film used for packing cold foodstuffs.

DESIGNATORY PROPERTIES:

Guaranteed storage life: 2 years from the manufacture date. Natural-color pellets.

Inpipe-100

Polymer plant in Kiyanly, Turkmenistan

OBTAINED BY:

By the gas phase method at low pressure polymerization of ethylene on the catalyst.

PURPOSE:

The composition is intended for the manufacture of pipes and fittings for gas distribution networks, as well as pressure pipes and fittings for domestic drinking cold water supply.

DESIGNATORY PROPERTIES:

Exceptional high resistance to cracking under the action of the environment. High toughness. High level of rigidity. Warranty period of storage - 5 years from the date of manufacture.

T50-500

Polymer plant in Kiyanly, Turkmenistan

OBTAINED BY:

By the gas phase method at low pressure polymerization of ethylene on the catalyst.

PURPOSE:

Designed for molding, buckets, shopping carts, containers for food by casting method.

DESIGNATORY PROPERTIES:

An excellent index of the stiffness of the final product, compliance with the requirements for application with food products, medicines, etc. Warranty period of storage - 5 years from the date of manufacture.

PVC

Polyvinylchloride

SG-5

Xinjiang Tianye Group co., LTD

OBTAINED BY:

It is manufactured from petrochemical products ethylene and sodium chloride (cooking salt) by polymerization of vinyl chloride.

PURPOSE:

It is intended for manufacture of delivery and drain sewage pipes, structural shapes and window profiles, fitting pieces, packing materials, wrapping, reveals, panels, and window sills.

DESIGNATORY PROPERTIES:

It is essentially a white powder that contains no ethyl alcohol and sulfate ash, psychotropic and narcotic substances and their derivative admixtures. Not applicable in the food industry.

SI-67

JSC “Sayanskkhimplast”

OBTAINED BY:

It is manufactured from petrochemical product ethylene and sodium chloride (cooking salt) by polymerization of vinyl chloride.

PURPOSE:

It is intended for manufacture of delivery and drain sewage pipes, structural shapes and window profiles, fitting pieces, packing materials, wrapping, reveals, panels, and window sills.

DESIGNATORY PROPERTIES:

It is essentially a white powder that contains no ethyl alcohol and sulfate ash, psychotropic and narcotic substances and their derivative admixtures. Not applicable in the food industry.

LLDPE

Linear
Polyethylene

Rotational molding powder RotoPol UR644

Manufacturer: Polymer Corporation LLC

OBTAINED BY:

It is a polymer compound used for manufacturing various polymer items such as water-filled road barriers, large-size septic tanks and plastic wells, water vessels and tanks with a volume exceeding 5,000 liters by using the rotational molding method. The material is suitable for coloring, has good forming and mechanical properties and withstands various weather conditions.

DESIGNATORY PROPERTIES:

Guaranteed storage life: 3 years from the manufacture date. Natural-color pellets.

PE 5118Q

PJSC “NizhnekamskNeftekhim”
Technical specification: 2211-145-05766801-2008

OBTAINED BY:

Gas-phase method of copolymerizing ethylene with butene-1 and hexene-1 in the presence of complex organometallic catalysts.

PURPOSE:

The compound is intended for manufacture of high-strength stretch film.

DESIGNATORY PROPERTIES:

Guaranteed storage life: 2 years from the manufacture date. Natural-color pellets.

EPS

Polystyrene granules

Polystyrene granules

PJSC "Sibur Holding"

OBTAINED BY:

Produced in the form of granules. Then the granules are filled with pentane and heated by steam, resulting in pentane becoming volatile and expanding. As a result, polystyrene beads "swell" in 20-50 times. The cells in each ball are filled with air and get elastic, after which they are glued together under the action of steam. 

PURPOSE:

Used for the production of heat-insulating building boards, as well as fire-resistant technical and food packaging.

Polystyrene granules

Jiangsu Sunchem New Materials Co.,Ltd.

OBTAINED BY:

Expandable suspension polystyrene is produced in the form of spherical particles, the surface of which is treated with various substances that prevent the accumulation of electrostatic charges during transportation and improve the processability of the polymer during processing. JIACHANG in appearance is a translucent, spherical, milky-white particles.

PURPOSE:

JIACHANG EPS - designed for the manufacture of thermoforming heat and sound insulation materials in the form of polystyrene blocks, various types of packaging, as well as for the manufacture of other technical products. Contains additives for protection against ignition.

PP

Polypropylene

Polypropylene Н030GP

Manufacturer: LLC Tomskneftekhim
TU 2211-103-70353562-2010

OBTAINED BY:

Polypropylene is obtained industrially by polymerizing propylene using Ziegler-Natta catalysts or metallocene catalysts.

PURPOSE:

PP H030GP is a general purpose product and can be used in the manufacture of products by injection molding, extrusion and thermoforming.

DESIGNATORY PROPERTIES:

Shelf life: 3 years from the date of manufacture. Natural color granules.

Polypropylene R003ЕХ

Manufacturer: LLC Tomskneftekhim
TU 2211-103-70353562-2010

OBTAINED BY:

Polypropylene is obtained industrially by polymerizing propylene using Ziegler-Natta catalysts or metallocene catalysts.

PURPOSE:

The product is characterized by low fluidity, special composition of the stabilization formulation, ensuring long-term operation of products in conditions of elevated temperatures. It is designed for the production of pressure pipes of PPR80 class by extrusion.

DESIGNATORY PROPERTIES:

Shelf life: 3 years from the date of manufacture. Natural color granules.

Polypropylene TPP D 30S

Manufacturer: Complex of oil refinery in Turkmenbashi, Turkestan

OBTAINED BY:

Received from cracked gas of petroleum and petroleum products using catalysts.

PURPOSE:

Designed for the manufacture of filament tissue, sheet thermoplastics and monofilament. Used in the form of rigid sheets in the manufacture of glasses, packages, trays for food.

DESIGNATORY PROPERTIES:

Extra-strong, waterproof, electrical insulating, non-hazardous, high wearing feature.

Polypropylene TPP D 30S

Manufacturer: Complex of oil refinery in Turkmenbashi, Turkestan

OBTAINED BY:

By the Gas-phase fluidized bed method with high activity and stereospecificity of the catalytic system CONSISTA.

PURPOSE:

Designed for the manufacture of elongated tape, which is used in the manufacture of bags, geotextiles, bases for carpets, harness.

DESIGNATORY PROPERTIES:

Color stability, increased strength, low water entrainment and high-speed processing.